Category:

To improve the resilience of the Thames Water Ring Main we designed a five kilometre tunnel using a method that eliminated the need for a secondary lining.  By pre-casting the concrete segments with a watertight seal, six months was saved on the three year programme.

This project was the Institution of Civil Engineers (ICE) London Awards 2010 Special Award Winner.